Elite Cleanup — Amarillo, TX dumpster rental

Renovations · flips · whole-house guts

Interior demolition, down to the studs

Can you gut a whole house in Amarillo before a renovation?

Yes. We handle whole-house interior demolition in Amarillo for renovations and flips: fixtures, cabinets, drywall or plaster, and flooring, down to the studs if that's the plan. We set our own dumpster in the driveway, the debris goes straight in, and we leave the shell swept and ready for your trades.

Updated

What comes out, top to bottom
  1. Fixtures, appliances and doors
  2. Cabinets, counters and built-ins
  3. Trim, baseboard and casing
  4. Drywall or plaster and lath
  5. Flooring and underlayment
  6. Down to studs and subfloor

How it goes

  1. Walk-through

    We walk every room with you, tape off what stays, and note anything that needs a licensed trade before tear-out starts.

  2. Permits and utilities

    Water, gas and power to the work areas get shut off and made safe by your plumber and electrician before demolition begins.

  3. Dumpster set

    We set the dumpster as close to the front door as the driveway allows, with boards under the rails.

  4. The work

    The tear-out runs from the top down: fixtures first, then cabinets, walls, and floors last so the debris has somewhere to go.

  5. Haul-off

    Full boxes get swapped so the job doesn't stall waiting on space.

  6. Final cleanup

    We pull nails, sweep the subfloor, and leave a shell your framer or drywall crew can walk into.

What's included

  • A walk-through to mark what stays: walls, windows, stairs, anything you're keeping
  • Tear-out room by room, in the order your trades need
  • Fixtures, cabinets, trim and doors removed and loaded
  • Drywall, plaster and flooring stripped to studs and subfloor where the scope calls for it
  • Our dumpster on site, with swaps when it fills
  • Haul-off to a licensed disposal facility
  • A broom-swept shell at the end

Not part of the job: Asbestos or lead abatement — a licensed abatement contractor handles that first; Moving load-bearing walls without an engineer's or builder's plan; Capping plumbing, gas or electrical — your licensed plumber or electrician does that.

Why does the order of tear-out matter on a flip?

On a flip, every day the house sits gutted is a day you're carrying it. We plan the tear-out around who's coming next. If the plumber needs the bathroom walls open first, that's where we start. If the flooring crew is booked for the end of the week, the floors come out last and clean.

The dumpster stays on site the whole time, so nothing piles up in the yard waiting for a haul.

The dumpster for this job

A full gut is mostly bulk: drywall, cabinets, trim and carpet stack up fast but don't weigh a lot, so a 30-yard usually makes sense. The exception is anything dense. Concrete, brick, tile mortar beds, stone and dirt only go in a 15 or 20-yard box, because a bigger box full of heavy material is more than the truck can legally haul. Older homes with plaster walls often get a second, smaller box.

  • 30yard

    Most whole-house guts. Drywall, cabinets and trim are bulky. 4 tons included.

    20 × 7 × 6.5 ft · 4 t · no heavy

  • 25yard

    Smaller homes or a gut of two or three rooms.

    16 × 7 × 6.5 ft · 3 t · no heavy

  • 20yard

    A second box for tile, mortar beds or plaster — the heavy stuff.

    14 × 7 × 5.5 ft · 3 t · heavy OK

Concrete, brick, dirt and stone go in a 15 or 20-yardbox only. Heavy material reaches the truck's weight limit long before it fills a bigger box.

Renting the box on its own? See dumpsters for demolition jobs or compare all four sizes.

What affects the price

  • Square footage and how many rooms come out
  • How deep the gut goes: cosmetic tear-out versus down to the studs
  • Wall material — plaster and lath is heavier and slower than drywall
  • Tile and mortar beds that need their own heavy-material box
  • Number of dumpster swaps
  • Access: stairs, second floors and how far debris has to be carried

Every job is quoted after the walk-through, in writing, with the dumpster and the haul-off in the same number.

Questions we get

Can I live in the house during interior demolition?

For a whole-house gut, no — dust, open walls and shut-off utilities make it unworkable. For a room or two, sometimes. We'll talk through what's realistic on the walk-through.

Do you remove load-bearing walls?

Only with a plan from your builder or engineer showing how the load is carried. Non-structural walls come out as part of the gut.

What happens if you find asbestos or old pipe insulation?

Work on that area stops. Suspect material stays put until a licensed abatement contractor tests and removes it. It never goes in our dumpster.

Can I salvage cabinets or doors before you start?

Yes. Tell us on the walk-through and we'll pull them carefully or leave them for you to take first.

What customers say about our dumpsters

“Excellent customer service! Will definitely be using them again for next home remodeling.”

Mary · Google review

Tear-down, haul-off, cleanup. One call.

Tell us what's on the site and where it is. We'll walk it, quote the whole job in writing, and set our dumpster before the work starts.

Call Elite CleanupGet a Quote