Partial demolition for remodels

Can you tear off part of a house and leave the rest?

Yes, and the part that stays matters most. Partial demolition takes out an addition, a wing, a wall or a section so your remodel can start. We plan the cut line with you, protect what stays standing, set our dumpsters, manage the tear-out and haul-off, and clean up so your builder starts on a clean site.

Updated

Partial demolition

What's included

  • Additions, sunrooms and enclosed porches
  • Exterior walls and sections of a building
  • A cut line planned with you or your builder
  • Weather protection on the open side, where needed
  • Our dumpsters on site and swapped as needed
  • Cleanup so the builder can start

Not part of the job: Structural engineering or shoring design; Framing or rebuilding after the tear-out.

How it goes

  1. 01 · Walk-through

    We walk it with you and, ideally, your builder. The cut line and anything load-bearing get settled before work starts.

  2. 02 · Permits and utilities

    Remodel demolition usually rides on the building permit. Your builder or the permit holder confirms it.

  3. 03 · Dumpster set

    We set an Elite Cleanup dumpster where the crew can load it, with boards under the rails.

  4. 04 · The work

    The section comes down in a planned order, with the part that stays protected from damage and weather.

  5. 05 · Haul-off

    We swap full boxes and haul every load to a licensed disposal facility.

  6. 06 · Final cleanup

    We leave a clean edge and a clean site so the next trade starts on day one.

How is the rest of the house protected?

The cut line is planned before anyone picks up a tool. Then:

  • Load-bearing walls and beams are identified first, with your builder.
  • The section comes down in an order that doesn't pull on what stays.
  • The open side gets weather protection if the builder isn't closing it up right away.

Permits and rules

Sourced. Rules change, so we confirm what applies before every job.

  • Demolition permit

    The City of Amarillo requires a permit from Building Safety before a building is demolished. On our jobs, the partner contractor pulls it.

    Source: City of Amarillo — Building Safety

  • Outside Amarillo

    Every city and county sets its own rules. Outside Amarillo, check with your city or county before anything comes down. We'll confirm what applies before the job is scheduled.

  • If your builder already has a permit for the remodel, tell us. The demolition is often covered by it.

The dumpster for this job

Most partial demolitions fit in a 20 or 30-yard box. If brick veneer, block or a slab section is coming out, it goes in a separate 15 or 20-yard: concrete, brick, dirt and stone are only allowed in those sizes because of the truck's weight limit.

  • 20yard

    A wall, a porch enclosure or a small addition.

    14 × 7 × 5.5 ft · 3 t · heavy OK

  • 30yard

    A full addition or wing.

    20 × 7 × 6.5 ft · 4 t · no heavy

  • 15yard

    Brick veneer, block or a slab section.

    14 × 7 × 4.5 ft · 2 t · heavy OK

Concrete, brick, dirt and stone go in a 15 or 20-yardbox only. Heavy material reaches the truck's weight limit long before it fills a bigger box.

Renting the box on its own? See dumpsters for demolition jobs or compare all four sizes.

What affects the price

  • Size of the section coming out
  • Brick, block or frame construction
  • How much protection the remaining structure needs
  • Whether a slab or footing comes out
  • Access and box placement

Every job is quoted after the walk-through, in writing, with the dumpster and the haul-off in the same number.

Questions we get

Do I need an engineer?

If the section ties into load-bearing walls or the roof structure, your builder may want one. We don't design shoring; we plan the tear-out around what they specify.

Who does the demolition?

Elite Cleanup manages it from quote to final cleanup and supplies the dumpsters. The work is done by licensed, insured local contractors we partner with.

Can you do the interior gut at the same time?

Yes. See interior demolition. Doing both together keeps the dumpsters and the schedule simple.