House demolition, from permit to clean lot
Can Elite Cleanup tear down a house in Amarillo?
Yes. We handle house demolition in Amarillo and across the Panhandle: we walk the lot, line up the permit and utility steps, set our own dumpsters, manage the tear-down and haul everything off. You deal with one company from the first call to a clean, level lot ready for whatever comes next.
Updated
Permits and rules
Sourced. Rules change, so we confirm what applies before every job.
Demolition permit
The City of Amarillo requires a permit from Building Safety before a building is demolished. On our jobs, the partner contractor pulls it.
Licensed contractor and Lot Clearance Bond
Amarillo's contractor licensing rules add a Lot Clearance Bond requirement for building demolition.
Source: City of Amarillo — Building Safety (contractor licensing table)
Homeowner permits
Building Safety lets a homeowner apply for permits on a residence listed as their homestead exemption with the Potter or Randall appraisal district. Ask the City whether that covers the demolition you're planning.
Water and sewer taps
For a structure the City has declared dangerous, Amarillo requires the water and sewer taps to be abandoned through the City's Water Distribution Department (806-378-6826) before demolition begins.
Source: City of Amarillo — Provisional Permits (dangerous structures)
Gas and electric
In Amarillo, electricity comes from Xcel Energy and natural gas from Atmos Energy. Both get disconnected before any structure comes down. Outside Amarillo, call your utility.
Asbestos: a single house
Texas DSHS says one private residence isn't subject to the federal asbestos NESHAP rules, so no DSHS notice is required. That changes if other homes or commercial buildings on the same site are coming down too, or the building has more than four units.
Outside Amarillo
Every city and county sets its own rules. Outside Amarillo, check with your city or county before anything comes down. We'll confirm what applies before the job is scheduled.
- Tell us if the house still has gas or power service. Disconnects take time to schedule, so they go on the calendar first.
Who handles what
We handle
- A walk-through of the house, the lot and the access
- Help lining up the demolition permit and utility disconnects
- Elite Cleanup dumpsters set and swapped for the whole job
- Tear-down of the house, attached garage and porches
- Separate boxes for framing and for concrete or brick
- Haul-off of every load to a licensed disposal facility
- Final cleanup of the lot: nails, scraps and loose debris
You decide
- Whether the slab and driveway come out or stay
- Which trees, fences or outbuildings stay standing
- Anything you want salvaged before the work starts
- What the lot needs to look like at the end: rough clean or graded
Not part of the job
- Asbestos abatement — a DSHS-licensed abatement contractor removes any asbestos before demolition
- Tree removal and stump grinding
- New construction, fill or landscaping after the lot is cleared
How it goes
Walk-through
We walk the house and the lot with you: how big, how old, what's attached, and where the truck can back in.
Permits and utilities
Permit, utility disconnects and any required testing come first. Nothing comes down until the paperwork is in place.
Dumpster set
We set a big box for the structure and a 15 or 20-yard for brick and concrete, placed so the truck can swap them.
The work
The house comes down in sections — roof, walls, then the floor system — and goes straight into the boxes.
Haul-off
Full boxes leave as they fill, and empties go back in the same trip when the job is still moving.
Final cleanup
We pick the lot clean of nails, glass and scraps so it's safe to walk and ready for the next step.
The dumpster for this job
Most house demolitions run two kinds of box. A 30-yard takes the light, bulky material: lumber, roofing, drywall, insulation and contents. Concrete, brick, dirt and stone only go in a 15 or 20-yard box, because a full big box of masonry would be more than the truck can legally haul. Since the dumpsters are ours, we swap them on our schedule, not a rental company's.
| Size | L × W × H | Included | Heavy material | For this job |
|---|---|---|---|---|
| 30-yard | 20 × 7 × 6.5 ft | 15 days · 4 t | No | Framing, roofing, drywall and everything else from the structure. |
| 20-yard | 14 × 7 × 5.5 ft | 30 days · 3 t | Yes | Smaller houses, or the brick and slab once the framing is gone. |
| 15-yard | 14 × 7 × 4.5 ft | 30 days · 2 t | Yes | Concrete, brick and block — heavy material, kept small. |
Concrete, brick, dirt and stone go in a 15 or 20-yardbox only. Heavy material reaches the truck's weight limit long before it fills a bigger box.
Renting the box on its own? See dumpsters for demolition jobs or compare all four sizes.
What happens to the slab and the driveway?
That's your call, and it changes the job. Some owners want a bare, graded lot. Others are rebuilding and want the slab broken out so a new foundation can go in. Some keep the driveway for the next house.
Tell us what's next for the lot when we walk it. We'll plan the boxes and the cleanup around that, so nothing gets torn out that you wanted to keep.
What affects the price
- Square footage and number of stories
- Brick or stone veneer versus siding
- Whether the slab, driveway and walks come out too
- Access for the truck and the demolition equipment
- How many boxes the debris fills and how much of it is heavy
- Testing or abatement the house needs before work starts
- Distance from Amarillo within the 100-mile radius
Every job is quoted after the walk-through, in writing, with the dumpster and the haul-off in the same number.
Questions we get
Who actually does the demolition?
Elite Cleanup manages the job from quote to final cleanup. The demolition itself is done by licensed, insured local contractors we partner with, and the debris goes into our dumpsters on site. You have one company to call the whole way through.
Do I need to be there while the house comes down?
No. We need access, a clear plan for what stays and what goes, and a way to reach you if something comes up. Most owners come by at the start and at the end.
Can I keep anything out of the house first?
Yes, and you should take it before work starts. Fixtures, doors, cabinets or brick you want to save should be out of the house or clearly marked when we walk the job.
What if the house has asbestos?
A DSHS-licensed abatement contractor removes it before demolition starts. We don't do abatement, and asbestos material never goes in our dumpsters.
What customers say about our dumpsters
“Absolute top notch service! Delivered and picked up in a timely matter hassle free. Highly recommended.”
Tear-down, haul-off, cleanup. One call.
Tell us what's on the site and where it is. We'll walk it, quote the whole job in writing, and set our dumpster before the work starts.