Production builders · subdivisions
Builder lot cleanup, one street at a time
Can you keep a whole street of new builds clean?
Yes. We handle lot cleanup for production builders across Amarillo subdivisions: a dumpster on each lot, scrap picked up between trades, and a final cleanup before closing. That's a street of our boxes in the photo, one per lot. You tell us which lots are ready, and we keep the street moving.
Updated

What's included
- A dumpster on each active lot, or shared between lots where it fits
- Cleanups between trades, lot by lot
- Scrap, packaging and trash cleared from yards, curbs and the street
- Box swaps on a schedule or on call
- Pre-closing cleanup before the buyer walk-through
- One point of contact for the whole street
Not part of the job: Hazardous waste and leftover chemicals; Landscaping and sod.
How it goes
- 1Walk-through
- We walk the street with your super, note which lots are at which stage, and agree on a cleanup rhythm.
- 2Permits and utilities
- Permits get pulled where the city requires them, and gas, electric and water are disconnected before anything comes down.
- 3Dumpster set
- One box per lot, set where the truck can reach it without crossing fresh driveways.
- 4The work
- Lots get cleaned as each trade wraps up, so the next crew starts on a clear site.
- 5Haul-off
- Full boxes are swapped on your schedule or when your super calls.
- 6Final cleanup
- Each house gets a final pass before closing, so the buyer walk-through starts on a clean yard.
Why one box per lot?
Shared boxes on a busy street turn into a fight: one crew fills it, the next crew has nowhere to put scrap, and it ends up on the ground. A box per lot keeps each house's debris on its own lot and makes swaps simple — you call in a lot number, we swap that box.
The dumpster for this job
Most builders run a 20-yard box per lot and size up on bigger plans. Concrete, brick, dirt and stone only go in a 15 or 20-yard box because heavy loads hit the truck's weight limit first — so flatwork tear-outs and spoil stay out of the 30s.
Concrete, brick, dirt and stone go in a 15 or 20-yardbox only. Heavy material reaches the truck's weight limit long before it fills a bigger box.
Renting the box on its own? See dumpsters for demolition jobs or compare all four sizes.
What affects the price
- Number of lots and how many are active at once
- Cleanup frequency per lot
- Box sizes and number of swaps
- Pre-closing cleanups
- Distance between lots and phases
Every job is quoted after the walk-through, in writing, with the dumpster and the haul-off in the same number.
Questions we get
Can you work several subdivisions at once?
Yes. Tell us where your active lots are and we'll plan the boxes and cleanups around your schedule.
Do you clean up before closing?
Yes. A final pass before the buyer walk-through picks up the last scrap, packaging and trash in the yard and along the curb.
Can my super call in swaps directly?
Yes. Most builders have their supers text or call when a box is full.
One call for the cleanup and the boxes.
Tell us what's on the site and where it is. We'll walk it, quote the whole job in writing, and set our dumpster before the work starts.