What size dumpster does a construction job in Amarillo need?
For most Amarillo builds, Elite Cleanup sets a 20 or 30-yard roll-off. Framing scraps, packaging and drywall are bulky, so bigger boxes make sense. Concrete, brick or dirt from footings goes in a separate 15 or 20-yard box, because those sizes are the only ones rated for heavy loads.
How does a job site fill a box?
A dumpster lands, the rental clock starts, and the framing crew may not be done for two weeks. Drywall is weeks away after that. Knowing how your job fills a box helps you pick the size and the timing.
- Framing: lumber scraps, packaging and cut-offs pile up fast in the first two weeks.
- Rough-in and insulation: smaller volume, but steady for several days.
- Drywall: heavy, dense waste that fills a box quicker than its bulk suggests.
- Finish work: flooring scraps, trim cut-offs and packaging from fixtures and cabinets.
Projects run long in Amarillo. Weather, back-ordered material and sub schedules all push dates. Tell us when the box is getting full and we'll swap it — pick up the full one, set an empty one.
Where do the boxes go on a new-build street?
On the new streets on the southwest side of Amarillo, we often set one box per lot. Our truck needs about 60 feet of straight approach to back in, and the box sits flat on a 14 × 7 ft pad for a 15 or 20-yard, or longer for a 25 or 30.
Crews working along I-40 and Loop 335 deal with tight staging and heavy daytime traffic. Tell us when your crew shows up and where the box should land, and we'll time the drop around it.
What about extended rentals for contractors?
15 and 20-yard boxes include up to 30 days. 25 and 30-yard boxes include up to 15 days. Builders and contractors may qualify for longer terms on ongoing jobs — ask when you call. After the included days, there's a daily rate.
Which size for this job?
| Size | L × W × H | Included | Good for |
|---|---|---|---|
| 20-yard | 14 × 7 × 5.5 ft | 30 days · 3 t | Most common on a single home. Fits a 14 × 7 ft driveway pad. |
| 30-yard | 20 × 7 × 6.5 ft | 15 days · 4 t | Whole-house framing, drywall and finish waste. 15 days included. |
| 15-yard | 14 × 7 × 4.5 ft | 30 days · 2 t | Footings, brick, block or dirt — kept separate and kept small. |

