What size dumpster does a demolition job need?
Most Amarillo teardowns use two Elite Cleanup boxes: a 30-yard for framing, drywall, roofing and contents, and a separate 15 or 20-yard for the slab and footings, because concrete only goes in those sizes. We deliver, swap full boxes and haul them away. Want the tear-down handled too? We manage demolition as well.
Why do teardowns often need two boxes?
You could half fill a box with old footings and already be near the weight limit. The same box could hold a mountain of drywall and insulation with room to spare. That's why many Amarillo teardowns use two boxes: a big one for the structure and a 15 or 20-yard for the foundation.
Many Amarillo homes sit on slab foundations. When a house comes down, there's no basement to hide debris. It all lands on the surface and needs to leave fast.
What has to happen before the box arrives?
Get your permits and testing done first. Ordering a dumpster before permits and asbestos questions are settled can leave it sitting empty. In Amarillo, the City's Building Safety Division issues demolition permits. The step-by-step version is in our guide to getting a house demolished in Amarillo.
Want us to handle the tear-down too?
We do that now. Elite Cleanup manages demolition from quote to final cleanup: licensed, insured local contractors we partner with do the tear-down, our dumpsters sit on site, and we haul it off and clean up the lot. Sheds, garages, barns, mobile homes, houses and interior tear-outs all have their own pages under Demolition.
Which size for this job?
| Size | L × W × H | Included | Good for |
|---|---|---|---|
| 30-yard | 20 × 7 × 6.5 ft | 15 days · 4 t | Framing, drywall, roofing and contents from the structure. 15 days included. |
| 20-yard | 14 × 7 × 5.5 ft | 30 days · 3 t | Smaller teardowns: a garage, a shed, a fence line. |
| 15-yard | 14 × 7 × 4.5 ft | 30 days · 2 t | Slab and footings — heavy material stays in a 15 or 20. |

